Unless youre playing at the highest level, youre probably your own equipment manager. After the game youve got to pack up all of your equipment, haul your bag home, as well as clean your own gear and thats fine. You love the game and heaving around mounds of equipment is just part and parcel of being a hockey player. Whats not fine is not having a proper way to store your equipment. Today, we start off with a piece of furniture that is essentially self-sustaining: A hockey stick rack built out of hockey sticks.Here are the full build instructions as provided by our friends at Hockey Stick Builds.Design Approach The hockey stick rack is not difficult to build. It only involves making some careful measurements and trusting the design. The major components of the hockey stick rack: 1. Base2. Vertical Supports3. Rack Top4. Finishing PiecesTools and hardware for the project: Tools - Miter Saw- Drill- Tape Measure- Bar clamps- Spring clampsHardware 1. Around 15 sticks2. 4 #6, 1.5" sheet metal screws3. 40 #6, 1.25" sheet metal screws4. 5/8" x 1 wooden dowel rodBuild - BaseWell start by building the base. The base shown here is 46" in length, however you can change this to fit your desired size. Ive found that 46" is right around the sweet spot for guaranteed good length of sticks. Your choice of this length is important since youll need 8 sticks that are that length or longer.Begin by cutting 4 sticks to a length of 46" and 2 to 17.25". For those two sticks 46"in length that you want to be on the bottom, drill a 17/64" hole through only ONE side of the stick, about 9/16" from the outer corner and midway in both dimensions of the long side at each end and at the shown locations. These ones in the middle will be used to attach the extra stiffening pieces later. These are clearance holes for the screw head since we want the stick rack to actually sit on the stick and not on the hardware.Drill in #6 1.25" sheet metal screws into the four corners, through the 3 sticks that make up the base as shown in the picture. Dont touch the 4 holes in the middle; we will use them to add support pieces later. If you know how many and the pitch of bottom support sticks, you can add those screw head clearance holes now as well. Vertical Supports Cut two more lengths of 37.35" and 18". Attach each 37.25" stick vertically to the base by using four #6 1.25" sheet metal screws into the two base pieces as shown. Ensure that the sticks are nice and orthogonal to the base or there will be a lot of twisting in the overall frame. The other option is to screw one screw into the base at this time and the remaining 3 once the top is attached at the end of assembly.Fix the 18" length stick to the rack using one #6 1.25" sheet metal screw to the vertical support as shown and one #6 1.5" sheet metal screw directly into the base.Rack Top To make the top rack, we will start with the small side pieces and the large angle piece that makes the triangle with the base. Cut one piece of stick to a length of 4.5". Next, cut a stick to have a bevel of 22 degrees on either side and a length of 38 9/16" on each side as shown in the image below. Note, the overall length is not 38 9/16". Rather, each side is that specific length. Attach the two pieces by offsetting the beveled stick by 2 7/64" from the front and attaching with a #6 1.25" sheet metal screw at an angle. Repeat for the other side of the stick rack.Now youll need to cut more sticks to length: two to 46", one to 1.75", and two to 1 3/16". At this point, also cut six 1.5" lengths of the dowel rod. These will be used as the dividers for the stick and keep them from sliding along the top stick. Attach the small 1 3/16" stick pieces to the front cross beam stick about 1 5/32" from the end, the width of a standard stick. Use two #6 1.25" sheet metal screws for each piece to prevent them from rotating.Now attach each of the dowel rod pieces by drilling a small hole in the back and fixing to the cross beam stick from behind using a #6 1.25" sheet metal screw just like the small pieces before. Each dowel rod is located 6" from the small stick pieces on the outside you just attached and from each other as you go from outside to inside. Ensure the dowel rod is centered nicely in the vertical direction on the stick.Take this cross beam pieces and attach it to either side/angle pieces with two #6 1.25" sheet metal screws each as shown below. This cross piece should be 0.5" from the front of the side pieces. Note that the front is the direction that the angle piece is pointed toward. Now take the second 46" cross piece and use four of the same sheet metals screws to attach that into place ensuring it is 0.75" from the back of the side pieces so the vertical support sticks can fit into this spot. To finish off, you can simply glue a 1.75" piece into the midsection (23" from the edge) between the two cross pieces. It is not necessary, but will add some additional support for the sticks. Highly recommended. Fix the top with angle pieces to the two vertical sticks and base as shown in the image with #6 1.25" hardware. The vertical stick should fit nicely behind the side pieces and can be attached with two #6 1.25" sheet metal screws on each side as shown with red tops here. Be careful not to drill them too high; they could hit the two screws coming in from the top used to attach the cross beam to the side piece.The overall top will look similar to this when complete: Attach the angle pieces to the base using a single #6 1.5" sheet metal screw into the side as shown which will really add a lot of rigidity to the entire rack. Finishing PiecesThe stick rack is completed by adding spacers and additional base sticks. Take two 3" length of stick and insert them between the two longer sticks in the rack front and back. Youve already drilled the screw head clearance holes earlier so all you need to do is center them and screw them in with two more #6 1.25" sheet metal screws each. These add strength to the bottom pieces which are likely to be stepped on the most frequently. Finally, you can add at 1 or more additional base cross pieces on which the sticks will rest on the base. The model has two spaced to be the width of the short side of the stick here in the model. My actual pictures show a wider gap (the width of a stick) made using only one stick. These final configuration depends on how many sticks you have and how you want it took look. Regardless, youll need at least one to ensure a nice flat surface. Once the glue dries from 1.75" support piece at the cross beams at the top, youre all done!For a full model of the stick rack and even more great designs, visit the guys over at Hockey Stick Builds. Guillermo Ochoa Jersey . The 49ers announced the deal Tuesday. San Francisco selected Lloyd in the fourth round of the 2003 draft. Diego Reyes Jersey . That assertion is getting harder and harder to make, especially given the way 23-year-old Danilo Gallinari has been playing this season. http://www.soccermexicojerseysteamstore.com/alfredo-talavera-mexico-jersey/ .Balotelli uploaded on Instagram a picture of the video-game character Super Mario, with whom the Italy international shares a nickname, with text around the image including jumps like a black man and grabs coins like a Jew. Jonathan dos Santos Jersey . The R&A announced Monday that golfs oldest championship will return to Royal Portrush in Northern Ireland for the first time since Max Faulkner won in 1951. Hirving Lozano Jersey . Canadas 5-1 loss to Finland in the semifinal ranks as the tournaments most-watched game with a record 2.7 million viewers, the largest ever for a World Juniors game played outside of North America, and winning Saturday as the most-watched program on Canadian television.CANTON, Ohio - Andre Williams ran up some big numbers at Boston College. The fourth-round draft pick is showing glimpses that can do it for the New York Giants, too. Williams had seven carries for 48 yards and scored on a 3-yard run in a 17-13 victory over the Buffalo Bills on Sunday night in the preseason-opening Hall of Fame Game. "It gives me confidence. I feel like Im supposed to be here," said Williams, who led the nation with 2,177 yards rushing last season. "Im part of the team now." And a more important part with David Wilson sidelined after sustaining his second neck injury in less than a year. Filling the No. 2 spot behind newly acquired starter Rashad Jennings, the Heisman Trophy finalist helped provide the Giants re-tooled backfield a 1-2 punch. "I though he played well, and that was encouraging," coach Tom Coughlin said. "David Wilsons injury not-withstanding, its very important to us no matter what, because you need a natural rotation." Williams score, which came after a 21-yard scamper off left tackle, put the Giants up 7-3 late in the first quarter. Rookie receiver Corey Washington scored the go-ahead touchdown on a 73-yard pass up the right sideline from backup Ryan Nassib with 13:18 remaining. Washington reached back to catch the partly under-thrown pass, then stepped around flat-footed defender Kamaal McIlwain. Nassib, competing for the backup spot, went 7 of 12 for 139 yards. Starter Eli Manning played three series, and finished 6 of 7 for 43 yards, but lost a fumble. For Buffalo, starting quarterback EJ Manuel had several lapses during two series. He completed just 2 of 7 attempts for 19 yards, and nearly had a pass intercepted by linebacker Jacquian Williams inside the New York 10. Manuel never looked off his intended target Sammy Watkins and was fortunate to have Williams bat the ball down. "I would have liked to throw a touchdown pass or to score a touchdown while I was in, but its our first game," said Manuel, the second-year player who has been inconsistent through the first two weeks of training camp. "We goot our feet wet, and were looking forward to moving on to playing Carolina.ddddddddddddquot; Coach Doug Marrone didnt sound as positive regarding the play of any of his quarterbacks. "Obviously, the performances were not good for a win," Marrone said. "Weve got to get better, all of them." Bills backup Jeff Tuel hit Robert Woods for a 2-yard touchdown pass on fourth-and-goal to put Buffalo ahead 10-7 early in the second quarter. Tuel finished 12 of 17 for 74 yards and an interception. Watkins, the Bills first-round pick, was held without a catch after being targeted three times. Two passes from Manuel directed Watkins way were tipped. Manuel also was late in finding Watkins flying up the left sideline, and overthrew him by a few yards. It was a disappointing debut for Watkins, who had made numerous highlight-reel catches during the first two weeks of training camp. Dan Carpenter made two field goals, including a 51-yarder. New Yorks Brandon McManus hit a 47-yard field goal The Bills are coming off a 6-10 season in which they extended their playoff drought to 14 seasons — the NFLs longest active streak. The Giants (7-9) had a busy off-season attempting to restock a team that has missed the playoffs in four of the past five seasons. The NFL unveiled a few new wrinkles that will run through the first two weeks of the preseason. New Yorks Josh Brown hit two and Carpenter hit his extra-point attempt, all of which were snapped from the 15-yard line rather than the 2. NOTES: Giants TE Daniel Fells left because of a sprained knee. ... Coaches and players on the sidelines also had the opportunity to view pictures of plays on tablets and in colour — an improvement over the black-and-white still photos that were printed off on paper. Marrone said his tablet initially didnt work. The problem was fixed and he used the technology in the second half. ... The game was played a day after the seven-member 2014 class was inducted into the Pro Football Hall of Fame. The group included former Giants defensive end Michael Strahan and former Bills receiver Andre Reed. ' ' '